"Examining a new building downtown or on Pioneer Road. When reviewing locations for a new police station, City officials looked at several site options.  One site considered was the School District Admin building, also known as the old junior high, located at 60 W Main St. Here is a breakdown of some of the costs that were reviewed between the two locations." with a chart showing cost breakdown of costs. Downtown cost est.: $30.6 Mil. Pioneer Rd cost est.: $22 Mil. Difference: $8.6 Mil. Property Tax impact (per $100K): Downtown: $77.19 | Pioneer $53.48  "Building a police station facility at the site on Pioneer Road versus the downtown reduces the property tax impact by over 44%."  "How long does it take to drive from each address to different locations? These numbers reflect normal drive time (NOT emergency response)" with a chart showing breakdown of times. "Avg. time difference between 2 sites: 21 seconds"